Posts Tagged ‘Mills Hall’

Parking Wars: Parking May Be Issue in 2011, Beyond

2011 and 2012 could be interesting years for Marietta College students, faculty, and staff when it comes to finding a parking spot.

With new dorm construction starting in March, a major portion of Marietta College parking spaces will be destroyed near Mills and McCoy Halls.  At the same time, proposed legislation in the City of Marietta would require parking permits for street parking on the North side of Campus.  Wondering how that’s all going to play out?  Check out the map below!  You can click on the colored boxes to find out what type of parking it will be, and where temporary and new parking lots will be.

More to the story below map!

Loading...
 

Color Codes:

White = Lost parking spaces
Light Blue = Temporary Parking Lot
Purple = New Parking Lot
Green = Faculty and Upperclassmen Parking
Blue = Upperclassmen Only Parking
Yellow = Faculty and Staff Only Parking
Red = Freshmen and Commuter Parking

Mills and Lower McCoy parking lots will be lost completely, while the College will maintain about 12 parking spots in the Upper McCoy lot (two of which will be handicap spots).  Temporary lots will be placed on either side of the old Miller Welding building on 4th Street, near the Commuter Lot across from the College’s tennis courts.  Demolition of Parsons Hall will yield a new parking lot on its location, with part of Parsons Field being paved as well.

Across the street from campus, if approved, homeowners would be eligible to purchase up to two parking passes for street parking spots near their home.  This is according to the Parkersburg News-Sentinel, which has been reporting on the issue more so than the Marietta Times of late.  As part of the proposal, parking spaces would be reserved for Sorority members living in the Chi Omega and Alpha Xi Delta houses.  Spaces would be restricted to pass holders between 7 AM and 6 PM, but would be available to anyone outside of those hours.  Fines for violating the parking restrictions would range from $25 to $50.

So how do you feel about this huge parking mess?  Let us know in the comments!

Be the first to comment - What do you think?

Posted by    Date: Monday, January 3, 2011

Categories: Campus, Marietta, Off Campus, Students

Tags: , , , , , , , , , , , , , , , , , , , , , , , , ,

MC To Start Dorm Construction in March

Students, Faculty, and Staff were e-mailed today to alert them that the new dorm project has officially been announced to the media.  Construction will begin in March.

2010-06-22 15.58.46With the last piece of the puzzle (funding from the Ohio Higher Education Facility Commission) dropping into place, the new dorm project is finally on its way to leaving conceptual drawings.  The new dorm, which has not been named yet, will be built along Putnam and 7th Street, and will form a “cornerstone” of the campus in what is currently a grassy area.

Marietta’s new dorm will follow the trend set by other schools its size in Ohio.  The new living space for over 350 students will feature a mix of living options: specifically, singles, doubles, and apartments like McCoy Hall.  Two singles will share one bathroom, while two doubles will do the same.  But different from McCoy, and original dorm plans from 2008, will be an in-dorm dining option and a health and wellness center.  We have sent an e-mail off to Tom Perry, Director of College Relations, for a better explanation of the health and wellness center.  What we do know for sure is that counseling services will move their offices into the new dorm as part of the center.

Another change with the new dorm design is the exclusion of Greek housing.  The original plan was to take the first floor of each wing of the new dorm, and place Delta Tau Delta and Lambda Chi Alpha chapters in those wings.  It was supposedly a way to get both chapters out of their decaying (and possibly non-code compliant) houses and into new digs.  However, various issues arose, and most Greeks were not for the move.

And if you’re a ‘green freak’ you’ll be happy to hear the new dorm will be built using LEED specifications as guidelines.

Heidelberg University recently started construction on their new dorm, which features many of the features Marietta has placed into theirs.  The major difference is that Heidelberg’s new dorm will be tied into a new Student Center.

DSCF1242With construction beginning this Spring, students may be left wondering where they will be parking.  According to the press release, the Mills and McCoy parking lots will be replaced with a new parking lot where Parsons and Parsons Field are currently located.  Considering that Parsons will still be in operations until the new dorm is built, we could be facing a parking crunch for the next year or two while construction and deconstruction occur.  We have also asked Tom Perry about this, and will publish more once we receive new information.

The new dorm will raise Marietta’s capacity from 1,400 students to 1,500.  MC is hoping to lure students who have moved off-campus back into college dorms, as fewer and fewer homes become available to rent to students thanks to City codes.  Another benefit will be eliminating the need for Parsons Hall, which has been in disrepair for years.  It’s design has also made it susceptible to crime, as we have reported on in the past.  it’s twin, Timlin Hall, was torn down years ago to make room for McCoy Hall.  Timlin was in much worse condition at the time.

Be the first to comment - What do you think?

Posted by    Date: Tuesday, December 21, 2010

Categories: Campus, Marietta, Students

Tags: , , , , , , , , , , , , , , ,

Construction on Campus

DSCF1213 Don’t worry, this isn’t any construction you’ll see when you get back.  Its stuff that Physical Plant is working on now so you can enjoy them come late August.

The picture to the left is of the new sidewalk that is being poured by Parsons and McCoy to replace the parking area used by construction workers.  That means no more walking in the road now.

Also, there is some work going on inside McDonough and Erwin Hall.  McDonough received donations for a renovation and purchase of digital presentation equipment.  Room 205 has been all re-done, with new paint, more narrow desks and chairs (so you can actually walk to your seat now, instead of navigating the maze of chairs in a narrow space), power and data hook-ups for every seat, and a new projector and smartboard combo for presentations and classes.

Erwin Hall saw its bathrooms enter ADA (Americans with Disabilities Act) compliance on the first floor, as the college continues the process of becoming 100% ADA compliant.
DSCF1218Lastly, the wooden stairway from the rear of the Dyson-Baudo Recreation Center to the McCoy/Mills parking lot has been torn up. I’m not sure if this will be replaced, rebuilt, or totally demolished. I guess we’ll see when we get back. However, this is a welcome sight, as the rubber material they had covered the stairs with had begun to come off and become a hazard for those who used it.

Off campus, look for a completely rebuilt Front Street, which saw all of the bricks pulled out and replaced, with a focus placed on pedestrian safety.  Speed tables now lead up to raised crosswalks, and flashing lights can be triggered to alert motorists to mid-block crossings.  Washington Bridge construction continues, so if you use State Route 7, you’ll have to use the provided detour, which sends you up or down Interstate 77.

Be the first to comment - What do you think?

Posted by    Date: Tuesday, July 21, 2009

Categories: Campus

Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,